Announcement
Collapse
No announcement yet.
Project: Turn-Key Idiot Machine
Collapse
X
-
Originally posted by clean4drxj View Postwhats left on the list?
pretty much everything
It actually took quite a long time to get those subframe rails leveled and squared perfectly to each other and the frame.
I took pictures of the angle finder, everything is 100% level from side to side, front to back, and completely square. Considering that is the foundation of the chassis, it was well worth the time i put in.
I hope to have the rest of the axle parts in by the end of the month and the chassis completed within the next couple weeks. But we will see, hopefully school being over next week means that i will have more time to get out there and work on it.No worries, I'm not actually back, I'm just reminiscing about the old days.
ForSure Motorsports
Win or Lose, We Booze.
Vice President of Internal Affairs at Dirty Donny's House of Hookers
Comment
-
Originally posted by HeavyMetal View Postany sponsors interested in getting on board with this team are preferred to have deep connections at mcdonalds corporation1998 Jetta GLX VR6 Raceland Optimo coilovers, c2 chip, CAI, straightpipe to magnaflow muffler, e-codes, billet alum. crackpipe. 42 draft designs SAI blockoff.
Comment
Comment