Announcement

Collapse
No announcement yet.

xj's gonna get a makeover

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Originally posted by clean4drxj View Post
    shoot me a text if you need a hand!
    I will, and ILl be home about 5 if you want to come by. I need ac ouple people, 2 to carry and one to operate the jackstands at least. So me, Bill and you would be perfect. Maybe a Tim
    Dan.
    2000 XJ, BJ 60 front, welded, 5.13's, 3 link, ruffstuff heims. D70 rear, detroit, 5.13's, discs. stretched. trail ready beadlocks. 39" Red labels. 4:1 Klune V-drive/D20, PSC full hydro

    http://www.facebook.com/people/Dan-M...00000913365979
    www.DMROFFROAD.com

    Comment


    • well, Tom.... u know the drill
      99 XJ on tons and 40s....

      Comment


      • So when is this pile gonna be ready for a a Mabell run?
        97 XJ.

        Comment


        • Pretty soon man, pretty soon. I have a few little things to do and I ran out of money lol. So it might take me a little bit to gather the rest of what I need.
          We got the front end back in the garage for final welding and gearing. AAAAAANNNNDDDDD I picked up my new favorite tool, this thing is going to make gearing SOOOO much easier. You can never beat having the right tool. Tried it out on the 60 carrier bearing that got damaged and it zipped it right off.

















          Dan.
          2000 XJ, BJ 60 front, welded, 5.13's, 3 link, ruffstuff heims. D70 rear, detroit, 5.13's, discs. stretched. trail ready beadlocks. 39" Red labels. 4:1 Klune V-drive/D20, PSC full hydro

          http://www.facebook.com/people/Dan-M...00000913365979
          www.DMROFFROAD.com

          Comment


          • Looks good!, the only thing that would annoy me is the spatter.

            Comment


            • Originally posted by clean4drxj View Post
              Looks good!, the only thing that would annoy me is the spatter.
              It does, but seeing as I dont really have a choice, it will have to be ok.
              I started to get the gears set. I got the pinion bearing on the new pinion, got it in the housing and preload set. I need to pick up a carrier bearing and race and then I can get the carrier in.
              I also final welded all the brackets, I had a few spots I wanted to go back to. I added another gusset just to make sure it was completely overkill lol.

















              Dan.
              2000 XJ, BJ 60 front, welded, 5.13's, 3 link, ruffstuff heims. D70 rear, detroit, 5.13's, discs. stretched. trail ready beadlocks. 39" Red labels. 4:1 Klune V-drive/D20, PSC full hydro

              http://www.facebook.com/people/Dan-M...00000913365979
              www.DMROFFROAD.com

              Comment


              • Doing work, Dan, keep it up.
                sigpic
                Official Space Shuttle Door Gunner of the Chechnyan Space Program

                Comment


                • I REALLY got some work done today. Thanks to Bill and my friend Tyler we got the axle geared, got the cover on, got it back under the jeep painted, pun new spindle seals in and got the axles and spindles on, put new rotors on the hubs and got the hubs mounted, got the calipers on and the lines on, drilled all the brackets for the 5/8" bolts the heims take, measured the driveshaft, and some other things Im sure. If I had my DOM I could have done the track bar and had it back down on its own weight.



















                  ride height







                  Dan.
                  2000 XJ, BJ 60 front, welded, 5.13's, 3 link, ruffstuff heims. D70 rear, detroit, 5.13's, discs. stretched. trail ready beadlocks. 39" Red labels. 4:1 Klune V-drive/D20, PSC full hydro

                  http://www.facebook.com/people/Dan-M...00000913365979
                  www.DMROFFROAD.com

                  Comment


                  • so its just waitin on DOM? whens the eta for that? brakes look good too!
                    99 XJ on tons and 40s....

                    Comment


                    • Tube will be here Wednesday. I ha e to shorten the shaft and get a new yoke, or conversion joint.
                      I need to plumb the rear brakes, and at some point make a new upper link.
                      Dan.
                      2000 XJ, BJ 60 front, welded, 5.13's, 3 link, ruffstuff heims. D70 rear, detroit, 5.13's, discs. stretched. trail ready beadlocks. 39" Red labels. 4:1 Klune V-drive/D20, PSC full hydro

                      http://www.facebook.com/people/Dan-M...00000913365979
                      www.DMROFFROAD.com

                      Comment


                      • well give me a ring and well get her done!!
                        99 XJ on tons and 40s....

                        Comment


                        • Didnt do much today but I can say that the front end its self is done.
                          I think this makes it official.








                          I have to say, nothing makes an XJ look more bad ass than seeing 8 lug wheels, full float shafts and locking hubs.
                          Dan.
                          2000 XJ, BJ 60 front, welded, 5.13's, 3 link, ruffstuff heims. D70 rear, detroit, 5.13's, discs. stretched. trail ready beadlocks. 39" Red labels. 4:1 Klune V-drive/D20, PSC full hydro

                          http://www.facebook.com/people/Dan-M...00000913365979
                          www.DMROFFROAD.com

                          Comment


                          • Originally posted by ct67_72 View Post
                            I have to say, nothing makes an XJ look more bad ass than seeing 8 lug wheels, full float shafts and locking hubs.
                            Amen.
                            97 XJ.

                            Comment


                            • Looking great though.
                              97 XJ.

                              Comment


                              • so on to track bar !
                                99 XJ on tons and 40s....

                                Comment

                                Working...
                                X